Extra equipment

Stone separator

Conversion kit that separates unwanted stones from the straw

Conversion kit

When the straw is pressed, it is difficult to avoid stones getting into the bales. These stones can cause unscheduled stops and more frequent cleaning of the boiler system. The result of installing this stone trap is a smoother and safer operation.

The stone trap can be mounted on plants where the straw transport is done pneumatically.

Specifications

Size: available in Ø150 mm and Ø200 mm
Connection: works by means of the barbell principle and therefore does not need to be connected to power
Measurements: construction measurements fit with existing bending

Assemble yourself

To install the stone trap, a small part of the pipe is removed and the new part can be easily installed. This change is possible to perform on your own as a user manual is included.

In case of doubt or uncertainty, the Linka service department is of course at your disposal.

The AAA diploma has been awarded to Linka Energy A/S as of June 2025.

This company is one of 30,980 companies in Denmark that received the AAA diploma in 2025 for the highest credit rating based on Dun & Bradstreet’s credit assessment system.

Within the industry Manufacture of stoves, fireplaces, and heating equipment, the company is one of 9 companies with the same rating.

Contact

Send us a message

Support

Call for help

+45 97341655

Connect

Social media


Privacy Preference Center