St. Merlose Heating Plant

Straw plant secures large savings and green energy

The turnkey straw plant in St. Merlose has ensured large savings on straw and contributed to a reduction in CO2 emission.</p>
<p>consumers, some of which are large consumers. Until 1988 an oil based heating plant supplied the area, before the switch to straw was made. In early 2013 Linka was tasked with delivering a new, turnkey straw plant, which will supply the entire area with reliable, CO2 neutral heat. In addition to delivering the complete machine plant Linka was also responsible for building the boiler room and a 550 m2 straw storage.</p>
<p>Once again straw was chosen as fuel, since this is the cheapest source for heating. In addition straw is also a CO2 neutral heating source.</p>
<p>St. Merlose has an annual consumption of 3,000 tons of straw, all supplied by local farmers.

The plant

The straw plant at St. Merlose consists of a large 4,500 kW hot water boiler in 5-pass. The boiler is hereby designed for a better exploitation of the heat which results in better efficiencies and larger savings on fuel. In addition the boiler is designed for an operating pressure of 6 bars.</p>
<p>A straw crane ensures automatic fuel feed, where the straw bale is picked up from the storage and delivered into a safety box, also placed in the storage. The straw bale is then hydraulically moved into the cutter, which cuts off a slice that is fed into the boiler.</p>
<p>In addition a 1,000 m3 accumulator tank is installed. This can hold one million liters of water and hereby supply the entire area for 1-2 days, e.g. during service.</p>
<p>The automatic ash removal system transports the ash from the boiler to a 15 m3 ash container, placed outside the building. In addition a 4,500 kW oil boiler is installed as backup.

Specifications

Customer: St. Merlose Heating Plant
Location: Holbaek, Denmark
Fuel type: Straw
Plant size: 4,500 kW
Plant type: Hot water system
Energy type: District heating
Year: 2013
Media not available

Want to know more about this project?

Contact Jan

Efficiency up to

93,4%

The use of Linka’s world patented combustion technology ensures very high efficiencies.<br>
.

Reduction in straw

10%

Since the installation of the new plant St. Merlose uses 10 % less straw to supply the area.

Dust particles

1,5

mg/Nm3

The maximum limit is 40 mg/Nm3.


hos Tversted Kraftvarmeværk

Tversted Heating Plant

References

Tversted Heating Plant

Reliable wood pellet plant – a good investment

In 2015 Linka installed a wood pellet system at Tversted Heating plant.

Before installing the new biomass plant, Tversted Heating plant was one of the most expensive heating plants in Denmark, making it difficult to offer customers competitive heating prices. A settlement behind the energy agreement of 2012 enabled Tversted’s switch from gas to biofuel.

At that point, Tversted had already installed solar panels, and the wood pellet plant will therefore be used as a supplement during the cold seasons, ensuring that the area is well-supplied year round.

Since the plant is located within a residential area they were not able to expand the existing buildings. Therefore a wood pellet system, which takes up less place than other plants, was the optimal solution. To accommodate a possible switch of fuel in the future, the system was prepared for wood chips.

The plant

Linka installed a 1,000 kW hot water plant designed for a maximum operating pressure of 4 bars. A moveable step grate is installed inside the boiler and prevents development of clinker. The boiler is fed from the nearby pellet pit, with a scraper unit including seven scrapers. The scrapers move the wood pellets to a sunken auger from where they are transported to the boiler by augers.

An economizer is also installed on the plant. This will extract additional heat from the flue gas and increase the efficiency.

Specifications

Customer: Tversted Heating Plant
Location: Tversted, Denmark
Fuel type: Wood pellets
Boiler size: 1,000 kW
Plant type: Hot water system
Energy type: District heating
Year: 2015
Media not available

Want to know more about this project?

Contact Jan

CO koncentration

32

mg/Nm3

The CO emissions from the plant is
significantly under the limit value of 400.

Dust particles

<0,7

mg/Nm3

The flue gases are cleaned through
the bag filter, which reduces dust.

”In our experience Linka has listened and acted on the challenges we have presen-ted after installation of the wood pellet plant and the pellet pit.”

Georg Larsen, Chairman
Tversted Heating Plant


Komplet kedelanlæg hos Østerild Fjernvarme

Osterild District Heating

.

Osterild District Heating

CO2-neutral heat – also during cold seasons

In the autumn of 2016 Linka delivered a new boiler system for Osterild District Heating. By using wood chips as fuel the heating plant can offer their customers 100 % CO2 neutral heat, while achieving large savings on fuel costs.

The Danish district heating plant has supplied the citizens of Osterild since 1991. Today more than 250 consumers are attached to the plant, and their overall heat consumption is 5.5 million kWh per year.

Before installation of the new boiler Osterild used wood pellets for heating, and oil during periods with an extra high heating demand. Wood chips are generally cheaper and the heating plant has chosen to use dry forest chips in the future. This will be delivered from local forests. An existing wood chips storage and crane unit is reused,

while Linka has installed a new feeder funnel. The boiler’s automatic ash removal system will be attached to the existing ash system, which is also being reused.

With the new wood chips plant Osterild will replace the use of oil, even during the coldest season. The existing oil boiler will only be used as a backup.

The solution

Linka delivered a complete boiler system with a 2,000 kW Linka H boiler, designed for a maximum operating pressure of 4 bars and a maximum flow temperature of 110°C.

16 pressure tanks with soot valves are mounted on the boiler. These eject air through the boiler’s flue pipes to keep them clean. An additional six soot valves are mounted on the back of the boiler for cleaning the second flue pass. This means that manual cleaning is only necessary a few times every year.

A PLC control system is installed on the plant for monitoring the performance of the system. The control system can be accessed through an internet connection, which enables online service and trimming from Linka.

Specifications

Customer: Osterild District Heating
Location: Osterild, Denmark
Fuel type: Wood chips
Plant size: 2,000 kW
Plant type: Hot water plant
Energy type: District heating
Year: 2016
Media not available

Want to know more about this project?

Contact Jan

Payback time

6 yrs

With an annual net saving of 550,000 DKK the payback time on the plant is around 6 years.


Halmanlæg hos Boulstrup-Hou Kraftvarmeværk

Boulstrup-Hou Heating Plant

.

Boulstrup-Hou Heating Plant

CO2-neutral heat from local straw

In 2016 Boulstrup-Hou Heating Plant needed to expand their capacity, and once again Linka was chosen as the turnkey supplier of the new straw plant.

The Danish heating plant has been delivering heat for the entire Boulstrup-Hou area for more than 20 years. Since 2009 the heat has been supplied by a Linka straw plant. The heating plant has more than 650 consumers attached including some large consumers.

In 2009 Linka delivered a 950 kW straw plant for Boulstrup-Hou, which could now offer their users CO2 neutral heat.

Boulstrup-Hou needed to replace their existing straw plant with a new, larger plant in 2016, so they could double their capacity.

The heating plant had their older straw shredder replaced in 2013, with a larger TWIN shredder with a 24 meter double conveyor. These were adjusted for the new plant in 2016, so they could be reused. The straw is still being supplied by local suppliers.

As a turnkey contractor Linka was responsible for delivering a new biomass plant along with building a new boiler room and converting their existing building to the new, larger plant.

The plant

The new straw plant in Boulstrup-Hou consists of a 2,000 kW Linka H boiler designed for a maximum operating pressure of 6 bars. With a built-in step grate and Linka’s patented combustion technology, a complete burnout of the straw is ensured. A bag filter is also installed, where the flue gas is cleaned to reduce dust from the plant.

A high automation is achieved by adding an automatic string remover onto the existing conveyor. Earlier the conveyor was filled manually twice a day, but in June 2017 Linka installed a straw crane, which will fill the conveyor automatically and hereby reduce the operational need.

In addition an external ash container is placed outside the building. The ash is automatically transported from the boiler to the container.

Specifications

Customer: Boulstrup-Hou Heating Plant
Location: Boulstrup, Denmark
Fuel type: Straw
Plant size: 2,000 kW
Plant type: Hot water plant
Energy type: District heating
Year: 2016
Media not available

Want to know more about this project?

Contact Jan

Efficiencies up to

95,9%

Based on boiler tests made by the Danish Technological Institute.


Varmtvandsanlæg hos Hjallerup Fjernvarme

Hjallerup District Heating

References

Hjallerup District Heating

Green heating supply with financial gain

In late 2016 Hjallerup Heating plant had a Linka straw system installed, as a supplement to their use of solar heating. The switch to biofuel has already reduced prices on district heating in the area.

Hjallerup Heating plant was looking to reduce the users’ heating prices by installing a biomass plant, which will be the main heating source 7 months out of the year, when the solar heat cannot supply the entire area.

The system’s primary purpose is to supply Hjallerup and Klokkerholm with stable and environmentally friendly district heating.

Linka was chosen to supply the system, as we were able to deliver a dependable plant to a competitive price.

Hjallerup initially requested a 1,800 kW plant dimensioned for 2,300 kW. However, through dialogue with Linka it was decided that the plant should be dimensioned for 3,000 kW, to accommodate the area’s increasing demand.

Due to their easy access to cheap straw, it was decided beforehand that this would be the main fuel. Straw also offers the greatest impact on heating prices.

The system is prepared for a switch to wood pellets in case an alternative fuel is needed in the future.

The plant

The implemented solution was a 3,000 kW hot water boiler based on straw as primary fuel. The TWIN shredder is automatically fed by an installed straw crane which ensures a highly automated plant. In addition an automatic string remover is also installed on the conveyor.

The 5-pass boiler is designed for a more efficient use of the heat, which causes higher efficiencies and a larger saving on fuel.

The biomass plant is developed to handle a varying quality in straw. It is also equipped with a bag filter, which cleans the flue gas and hereby reduces dust.

Specifications

Customer: Hjallerup District Heating
Location: Hjallerup, Denmark
Fuel type: Straw
Plant size: 3,000 kW
Plant type: Hot water
Energy type: District heating
Year: 2016
Media not available

Want to know more about this project?

Contact Jan

Efficiency up to

93,17%

.

The plant is using Linka’s world patented combustion technology, where heated air is added to create the optimal amount of turbulence in the combustion area. Hereby the gases developed are completely burned which ensures a very high efficiency.

District savings

30

EUR per mWh

The switch to a Linka biomass plant along with the use of solar heating has resulted in lower heating prices for the customers in the entire area. .

"They offered us helpful advice when we were choosing a new plant, and the entire Linka team worked very well with our employees. In the future we hope to use heat from biofuel year round as a supplement to our solar heating."

Kaj Tranholm Olesen, Chairman of the board
Hjallerup District Heating


Vaarst-Fjellerad Heating Plant

References

Vaarst-Fjellerad Heating Plant

Optimized energy supply for Vaarst

In late 2016 Linka installed a wood chips plant for Vaarst-Fjellerad Heating plant, which is equipped with a crane system enabling automated fuel transport. Before installation of the new biomass plant Vaarst-Fjellerad was one of the 50 most expensive heating plants in Denmark. A settlement behind the Energy Agreement of 2012 enabled these heating plants to switch from gas to biofuel. Vaarst-Fjellerad decided to invest in a biomass plant, making it possible to lower the heating prices considerably in the entire area. Linka was chosen as a turnkey contractor for the solution in Vaarst-Fjellerad, which was erected from scratch. Linka was responsible for designing and dimensioning both the biomass plant and the surrounding buildings. The primary fuel is wet wood chips and Linka needed to design the solution to handle fuel with up to 50 % water.

The plant

The 1,000 kW wood chips plant installed in Vaarst-Fjellerad, is equipped with automatic fuel supply by crane as well as automatic ash extraction. Thus making it a fully automated plant where photo cells are ensuring a constant supply of wood chips. In addition the ash is transported outside the boiler and into an ash container, located outside the building. By installing a condensing biomass plant the flue gas is condensed and cleaned through a bag filter. This results in more energy and more heat, with less dust. A special feature for this plant is the addition of a filter filled with shavings, which removes cadmium from the condensate by filtering it through the shavings. This is a cost efficient solution which ensures that Vaarst-Fjellerad complies with the emission requirements.

Specifications

Customer: Vaarst-Fjellerad Heating Plant
Location: Vaarst, Denmark
Fuel type: Wood chips
Boiler size: 1,000 kW
Plant type: Hot water system
Energy type: District heating
Year: 2016
Media not available

Want to know more about this project?

Contact Jan

CO koncentration

150

mg/m3

CO emission from the plant is significant-ly below the limit value of 625.

Dust particles

<0,32

mg/m3

The flue gases are cleaned through the bag filter, which reduces dust.


Halmanlæg hos

Ornhoj-Gronbjerg District Heating Plant

.

Ornhoj-Gronbjerg District Heating Plant

New straw plant replaces the use of gas

In 2017 Linka delivered a new straw system for the heating plant in Ornhoj-Gronbjerg. This will replace the use of gas with CO2 neutral biomass.

Ornhoj-Gronbjerg Heating Plant had a Linka biomass plant installed in the summer of 2017.

The Danish heating plant supplies heat for almost 500 consumers in the area.

The biomass plant was installed as a supplement to the existing solar panels, which cannot supply enough heat during winter seasons. Biomass will fuel 70 % of the heat production while solar heating will supply around 20 %. The remaining 10 % will be produced using gas.

A 2,500 m3 storage facility will store 600 straw bales, equivalent to 25 days of heat production. The plant is expected to use around 4,000 bales every year.

The plant

Linka delivered and commissioned a complete boiler system with a 1,500 kW Linka H boiler designed for straw combustion. The two extra passes, in the 5-pass boiler, ensures higher efficiencies and savings on the fuel.

A Linka double shredder is installed in the straw storage. The 30 meter double conveyor can hold 30 bales, and only needs refilling every other day. The automatic ash system transports the ash from the boiler to an ash room.

This room will store a large amount of ash for a long period of time, compared to an ash container. .

By installing a bag filter the flue gases are cleaned, thus reducing dust from the plant and ensuring better values on emission.

In addition, Linka was responsible for conducting environmental tests after commissioning the plant.

Specifications

Customer: Ornhoj-Gronbjerg District Heating Plant
Location: Ornhoj, Denmark
Fuel type: Straw
Size: 1,500 kW
Plant type: Hot water plant
Energy type: District heating
Year: 2017
Media not available

Want to know more about this project?

Contact Jan

Biomasseanlæg hos Lendemarke Fjernvarme

Lendemarke District Heating

References

Lendemarke District Heating

Stable and sustainable heating for consumers

CO2-neutral heating in the radiators

With E.ON as a partner, Lendemarke Fjernvarme has invested in a new biomass plant that supplies sustainable district heating to around 350 house-holds. The new plant from Linka Energy is 15 % more efficient than the previous plant.

The biomass plant is supplemented by a solar cell plant that delivers approximately 22 % of the heat used in Lendemarke.

The plant

The new plant consists of a 2,500 kW hot-water boiler that exclusively uses Danish-produced wood chips as fuel. The wood chips are delivered to a storage bin, after which they are fed into the boiler via an auger system. The ash that is a by-product of the incineration, is subsequently used as fertiliser. The patented combustion solutions in the plant are based on Linka Energy’s know-how and international experience.

A flue gas condenser, which is connected to the system, helps to cool and clean the flue gas before it is led out of the chimney. The emissions in this flue gas are below the statutory environmental requirements that will come into force in 2025.

The plant can operate unmanned for 72 hours, which is of great importance to the operating staff. At the same time, the plant can be monitored and controlled through remote access, which is connected to the staff’s telephones and computers. Through this remote access, Linka’s service department can also quickly support and guide the operating staff.

Specifications

Customer: Lendemarke District Heating
Location: Lendemarke, Denmark
Fuel type: Wood chips
Boiler size: 2.500 MW
Type of plant: Hot water system
Energy type: District heating
Year: 2020

Want to know more about this project?

Contact Simon

Dust particles

8,3

mg/m3

Dust from the plant is extremely limited,
compared to the requirement of maximum 30 mg/m3

CO koncentration

232

mg/m3

CO emissions from the plant are significantly below
the limit value of 850 mg/m3

“The reason we chose Linka was because we could save on man-hours and that the plant could be delivered at the time we wanted - and that the price was good.”

Steen Thagaard, Operations Superintendent
Lendemarke District Heating


Sønderborg Utility

References

Sønderborg Forsyning

CO2-neutral straw-fired plant replacing natural gas systems.

In 2020, Sønderborg Forsyning commissioned a new Linka straw-fired heating plant and began the process of decommissioning the six gas-fired heating facilities it was replacing.

The plant

The plant comprises a 10 MW thermal biomass boiler using sustainable locally sourced straw which meets the full capacity that Sønderborg Forsyning needs to supply the cities Nordborg and Havnbjerg.

The plant can run on autopilot for 72 hours. Monitoring and remote control can be performed from Sønderborg Forsyning’s central control room or even from their employees’ homes. It also has a 2,800 m3 accumulation tank which ensures a supply of heat for up to 12 hours, which allows an optimum use of the fuel and the operation of the plant.

The patented solutions in the plant are built on Linka Energy’s know-how and international experience. As a result, energy exploitation from a vast source of different types, volumes and qualities of straw is optimised. After the thermal energy is taken out of the fuel, the local farmers receive the ash which they use in their fields for its fertilizing properties.

The plant is a turn-key delivery by Linka Energy and is designed to accommodate future guests from Danfoss’ heat production development centre which is intended to be set up next door. Preparations for establishing a covered glass corridor between the buildings are therefore already underway.

Over the next few years, we at Linka Energy will cooperate as an Energy Partner for Sønderborg Forsyning to ensure successful initiation and to contribute to their ambitious ProjectZero strategy to reduce CO2 emissions to zero in the region by 2029.

Specifications

Costumer: Sønderborg Forsyning
Location: Nordborg, Denmark
Fuel type: Straw
Size: 10 MW
Plant type: Hot water
Energy type: District heating
Year: 2020
Media not available

Want to know more about this project?

Contact Jan

Reduction in CO2 emission

350.000

tonnes

The patented combustion technology contributes to the significant reduction in CO2 emissions over a period on 20 years.

Electricity consumption

4,61

kWh electricity/MWh

Efficiency

94%

The plant is using Linka’s world patented combustion technology, where heated air is added to create the optimal amount of turbulence in the combustion area. Hereby the gases developed are completely burned which ensures a very high efficiency.

"The whole project is done well. Linka has been nice to spar with on finding the optimal solution and how we can handle the different types of straw."

Jens Nansen Poulsen, project manager
Sønderborg Forsyning


The AAA diploma has been awarded to Linka Energy A/S as of June 2025.

This company is one of 30,980 companies in Denmark that received the AAA diploma in 2025 for the highest credit rating based on Dun & Bradstreet’s credit assessment system.

Within the industry Manufacture of stoves, fireplaces, and heating equipment, the company is one of 9 companies with the same rating.

Contact

Send us a message

Support

Call for help

+45 97341655

Connect

Social media


Privacy Preference Center